Tolerance and inspection
±0.005 mm Holds Only With a Closed Inspection Loop
Holding ±0.005 mm on a turned brass part is not a machine specification. It is a process. We qualify the first article, then check critical diameters at set intervals during the run. If a dimension trends, the operator adjusts before the parts leave the machine.
Every batch gets 100% inspection before shipment. That covers raw material verification, in-process monitoring, and a final dimensional check. We can supply reports on request, and we keep the data so a future question has an answer.
For parts with a fine finish requirement, we can turn to Ra 0.2–0.8 μm. For general turned parts, Ra 0.8–1.6 μm is the normal working range, and Ra 1.6–3.2 μm covers as-machined surfaces where cosmetics do not matter.
- 1
First article qualificationDimensions verified against the drawing before the run starts.
- 2
In-process monitoringCritical features checked at fixed intervals to catch tool wear.
- 3
Final inspection and reports100% inspection before shipment, with data available on request.