GreatLight CNC Machining Factory logo
CNC Machining
Rapid Prototyping
Materials
Industries
News
About GL

Get Instant Quote

CNC Machining Shop

A CNC Machining Shop Built Around Tolerances

GreatLight runs 127 high-precision machines across 3 plants in Dongguan, with a Singapore site for regional supply. We quote in 12 hours, machine metal and plastic parts to ±0.005 mm, and ship in 3–5 days.

±0.005 mm tolerance16 five-axis centersNo MOQISO 9001 / IATF 169493–5 day shipping
greatlight-cnc-machining-center-11
127High-precision CNC machines
16Simultaneous 5-axis centers
±0.005 mmAchievable tolerance
150Technicians on staff
Common failures

Where Outsourced Machining Goes Wrong

Four problems that show up after the drawing leaves your desk.

01

Quotes that take a week

You send a STEP file on Monday and hear nothing until Friday. The build schedule slips before a single chip is cut. Our quotation and DFM notes go back within 12 hours, so your planning window stays open.

02

Tolerance drift on the second run

First articles pass. Production parts drift 0.05 mm off nominal because the setup changed. Every batch here is inspected against the same datum scheme used for the first article, and final inspection reports travel with the shipment.

03

Thin walls that move after machining

A 0.8 mm aluminum rib measures fine on the CMM, then bows when the fixture releases. We plan stock removal sequence and support features before cutting, which keeps thin sections flat after unclamping.

04

Vendors who stop at the drawing

You get parts, not answers. No note on why a corner radius needs a 3 mm tool, no warning that a thread depth is unreachable. We flag manufacturability issues in the DFM review, before the job is priced and released.

Our approach

How This CNC Machining Shop Runs a Job

From file upload to boxed parts, one sequence, same team.

products-that-can-only-be-made-with-5-axis-cnc-machining
Machining capability

Five-Axis Work on a 4,000 mm Envelope

Complex geometry is where a CNC machining shop earns its keep. Our 16 simultaneous five-axis centers cut impellers, manifolds, and robot joints in one setup, so features that reference each other keep their relationship instead of stacking setup error. Rotary tables up to Ø400 mm handle the smaller, denser parts.

Large frames are not a problem either. Our largest travel is 4,000 × 400 × 150 mm, with medium platforms at 750 × 1,150 × 550 mm and 600 × 600 × 600 mm for enclosure and panel work. If a part needs turning after milling, 16 mill-turn centers finish both operations without a second fixture.

  • 1
    Five-axisOne setup for angled holes, undercuts, and blended surfaces.
  • 2
    Turn-millShafts and housings finished on one machine.
  • 3
    Large travelUp to 4,000 mm long frames and rails.

Get Instant Quote

cnc-machining-hdpe
Materials and finishing

One Shop for Metal, Plastic, and Finish

Aluminum is the most common request: 6061-T6, 6082, 7075, and 2024 for structural parts, 5052 and 5083 for formed and welded assemblies. Stainless 303 through 17-4PH covers food, medical, and marine parts. Titanium TA1, TA2, and TC4 (Ti-6Al-4V) run on the five-axis machines with coolant strategy set for heat, not speed.

Plastic parts get the same attention. ABS, PC, POM, PEEK, and HDPE cut cleanly when feeds and fixtures match the material. HDPE and PP need sharp tooling and light radial engagement to avoid smear. After machining, anodizing, bead blasting, black oxide, and laser marking run as a controlled step rather than a favor.

  • 1
    Aluminum6061, 2024, 5052, 6082, 7075, ADC12.
  • 2
    Stainless and steel303, 304, 316L, 17-4PH, 4140, 4340.
  • 3
    FinishingAnodizing, plating, powder coat, bead blast.

Talk to an Engineer

Selection guide

Which Process Fits Your Part

Use this when the geometry is borderline and you need to pick a route.

Part featureRecommended processWhy
Angled ports, blended surfaces5-axis millingOne setup keeps datums aligned
Long frame, open pockets3-axis, 4,000 mm travelRigid setup on a large table
Shaft with cross holesMill-turn centerTurning and milling without refixture
Thin rib under 1 mm4-axis with support planControlled stock removal order
Prototype in 5 days3-axis + hand finishFastest path to a physical part
10,000+ identical partsMill-turn or die castingCycle time drops per unit
Services

What This CNC Machining Shop Offers

Six routes, one quality system, one point of contact.

01

Five-Axis CNC Machining

Complex joints, impellers, and housings cut in a single setup on 16 simultaneous five-axis centers.

02

Three- and Four-Axis Machining

27 three-axis and 12 four-axis machines for plates, brackets, and parts with one or two angled faces.

03

CNC Milling and Turning

16 mill-turn centers handle shafts, bushings, and housings where turning and milling meet.

04

Rapid Prototyping

Machined prototypes from one piece, with DFM notes returned inside 12 hours.

05

Sheet Metal Fabrication

Brackets, panels, and enclosures formed and finished alongside machined components.

06

Surface Finishing

Anodizing, plating, powder coating, bead blasting, and laser marking under one roof.

Scope

Machines, Tolerances, and Order Sizes

The numbers we quote against.

ItemSpecificationNotes
Tolerance±0.005 mm (±0.0002 in)Verified on the CMM
Surface finishRa 0.2–0.8 μm fineRa 1.6–3.2 μm as machined
Largest travel4,000 × 400 × 150 mmLong frames and rails
Rotary tableØ400 mmFive-axis workholding
Order quantity1 to 10,000+ partsNo minimum order quantity
Quote turnaround12 hoursIncludes DFM analysis
Shipping3–5 daysAfter production release
Why GreatLight

Six Reasons Engineers Keep Sending Files

15Y

Machining Since 2011

Fifteen years of production work, now across 3 wholly-owned plants in Dongguan and a Singapore factory.

±0.005

Tolerance Held in Production

The same tolerance quoted on the first article is the one inspected on the last production batch.

12H

Quote and DFM in Half a Day

Files are reviewed by a process engineer, not a sales queue. Quotation and free DFM analysis return within 12 hours.

24H

Production Can Start in a Day

Once the drawing and material are confirmed, the job can be released to the floor within 24 hours.

100%

Inspection Before Shipment

Raw material check, in-process monitoring, and final inspection on every order. Reports on request.

4

Quality Systems in Place

ISO 9001:2015, IATF 16949:2016, ISO 13485:2016, and ISO 27001:2022.

7,600 m²Manufacturing space
150Technicians
99.99%Qualification rate
<2%Historical late-delivery rate
Sector requirements

What Each Industry Demands, and What We Deliver

GreatLight Specializing In Humanoid Robot Components

Robotics and Automation

Joint housings and harmonic drive parts need concentricity between bores or the arm loses repeatability. Five-axis machining holds that relationship in one setup.

  • ±0.005 mm
  • One-setup datums
  • 5-axis
low volume manufacturing

Automotive and EV

Battery housings and motor parts live or die on cooling channel alignment and flatness at the sealing face. We machine and inspect both against the drawing.

  • IATF 16949
  • Flatness control
  • 100% inspection
greatlight-cnc-machining-center-11 (1)

Aerospace Prototyping

Brackets and structural fittings need tight mass control and traceable material. Titanium and 7075 parts are machined with documented material and inspection records.

  • Ti-6Al-4V
  • 7075-T6
  • Traceable stock
GreatLight CNC Machining Compliance Center

Medical Devices

Instrument housings and fixtures need cleanable surfaces and documented inspection. ISO 13485 processes apply to material control and final release.

  • ISO 13485
  • Cleanable finish
  • Inspection records
FAQs

Questions Engineers Ask Before Ordering

What file formats do you need for a quote?

STEP and IGES are the safest for 3D geometry because they carry solid model data. For 2D work, PDF drawings with tolerances, datums, and thread callouts are enough.

If you only have a native CAD file, send it and note the revision. We will confirm what we can read before quoting.

How tight a tolerance can this CNC machining shop hold?

We quote and inspect to ±0.005 mm (±0.0002 in) on features that support it. That means a rigid part, a reachable feature, and a datum scheme that can be fixtured.

Very thin walls, deep small pockets, and long unsupported bores are harder. We will tell you in the DFM review if a feature cannot hold the tolerance you drew, rather than quote it and hope.

Which materials can you machine?

Aluminum 6061, 2024, 5052, 5083, 6063, 6082, 7075, and ADC12. Stainless 303, 304, 316, 316L, 420, 430, 431, 440C, and 17-4PH. Steel 1018, 1045, 4130, 4140, 4340, A36, and tool steel.

We also run copper and brass grades, titanium TA1, TA2, TC4 (Ti-6Al-4V), Inconel, magnesium AZ31B and AZ91D, plus plastics including ABS, PC, POM, PEEK, PP, HDPE, and carbon fibre.

Can you start with one part and scale later?

Yes. There is no minimum order quantity. A single prototype and a 10,000-part run both go through the same setup and inspection process.

The difference is in the method, not the paperwork. Prototypes often run on three-axis machines with hand finishing. Higher volumes move to mill-turn or casting when the geometry allows it.

How do you handle surface finish requirements?

As-machined surfaces land around Ra 1.6–3.2 μm. Finer work reaches Ra 0.8–1.6 μm, and precision surfaces can be held at Ra 0.2–0.8 μm.

If the drawing calls for anodizing, hardcoat, electroless nickel, black oxide, or powder coat, we machine to the pre-finish dimension and manage the coating as a separate step.

What happens if a part is out of tolerance?

In-process monitoring catches most drift before the part is finished. If a feature still measures outside the drawing, we stop and tell you before shipment.

You get the measurement data and a proposed fix. We do not ship a part and leave the inspection report for you to discover the problem.

How is my design protected?

Uploads are handled as confidential, and an NDA is available on request before you send files.

Access to customer data is limited to the engineers working on the job, and our ISO 27001:2022 system covers how that data is stored and controlled.

What does shipping and lead time look like?

Quotation and DFM analysis come back within 12 hours. Production can start within 24 hours of confirmation, and parts typically ship in 3–5 days.

Our historical late-delivery probability is below 2%. We do not promise a delivery date we cannot hold, so lead time is confirmed with the quote.

Send a Drawing, Get a Quote in 12 Hours

Upload your STEP file or PDF drawing and a process engineer will review it. No minimum order quantity, 100% inspection before shipment, and an NDA available before you share anything sensitive.

12-hour quoteFree DFM analysisNo MOQ100% inspection

Trusted by engineers and manufacturers worldwide

Tesla Ford Motor Company BYD Auto Denso Magna International Boeing Airbus Medtronic KUKA FANUC