Some Details to Be Careful When Machining the Tree Parts

Tree parts is the older shop term for shaft-type parts: long, round bodies that carry torque and support bearings. This page explains what actually drives their accuracy, and where a normal turning routine stops working.

L/D up to 40:1±0.005 mmRa 0.8–1.6 μm3-5 day shipping
CNC Knowledge: Some details to be careful when machining the tree parts in CNC
Geometry

What makes a shaft different from a plate

A shaft part is a rotary body. Its length is usually several times its diameter, and most of its dimensions are referenced back to one common axis. That single fact creates most of the difficulty. A plate can be re-clamped from any side without losing its reference. A shaft loses its reference the moment you unclamp it.

The functional surfaces on a shaft are the bearing journals, the shoulder faces that locate those bearings, and any taper or thread that has to run true. Coaxiality between journals and perpendicularity of a shoulder to the axis are what the assembly feels. Diameter alone tells you very little.

Long thin shafts also deflect. Cutting force pushes the workpiece away from the tool, so the middle of the part springs back after the tool passes and the finished diameter comes out larger than the programmed one. This is the source of the classic barrel shape: tight at both ends, oversize in the middle.

In our shop the practical limit for turning without a steady rest sits near 8:1 length-to-diameter. Beyond that the part needs support, a lower depth of cut, or both. Recognizing this early is the difference between a stable process and a scrapped run.

  • 1
    Bearing journalsUsually the tightest diameter and roundness callout on the drawing.
  • 2
    Shoulder facesControl axial location, so perpendicularity matters as much as the diameter.
  • 3
    Tapers and threadsMust run true to the same axis, not to their own local reference.
Preparation

Straightening and centering before the first cut

Bar stock does not arrive straight. It bends during rolling, during transport, and during storage on a rack. If you chuck a bowed bar and turn it round, the finished part is round but still bowed. The error is baked in before the tool touches it.

So the first operation is straightening, not turning. It is done on a press or a dedicated straightener, checked with a dial indicator on a surface plate. A common working limit for a general shaft is 0.5 mm total indicated runout per meter of length before machining starts. Tighter parts need tighter stock.

After straightening comes the center hole. This is the datum that carries the part through every later operation, so it has to be cut cleanly and concentrically. A worn center drill produces a bell-mouthed hole, the tailstock center seats on the bell instead of the cone, and every diameter you turn from that setup inherits the error.

For heavy shafts we rough-turn first and cut the center holes afterwards. Roughing releases residual stress and the part moves. Cutting the centers after that movement keeps the datum aligned with the real axis of the part rather than the axis the bar had on arrival.

  • 1
    Straighten firstCheck runout on a surface plate before clamping anything.
  • 2
    Fresh center drillA dull drill gives a bell mouth and a false datum.
  • 3
    Centers after roughingLets stress relief happen before the datum is fixed.
Datums

Choosing the right datum for machining the tree parts

There are three common ways to locate a shaft, and each one trades rigidity against access. Picking the wrong one is the most frequent cause of a part that measures well on the bench and fails in the fixture.

The first method uses the two center holes. The part turns between centers, so both ends share one axis and coaxiality between journals comes almost for free. The weakness is rigidity. A center hole is a small cone, and on a heavy part the cutting force can rock the workpiece on it. Depth of cut has to stay conservative.

The second method uses the outer circle together with a center hole. A steady rest or a chuck jaw supports the outside while the center hole holds the axis. This is the standard answer for long shafts because it adds support exactly where the part was flexing. Set the steady rest pads on a journal that has already been finished, or you will copy its error into everything downstream.

The third method uses two outer cylindrical surfaces, with no center hole at all. This is what you do for a hollow shaft, where there is no material in the middle to drill. It is also common for machine-tool spindles, where the two support journals are ground first and then used to locate the part for boring the internal features.

  • 1
    Centers onlyBest coaxiality, least rigidity. Light cuts on heavy parts.
  • 2
    Outer circle plus centerDefault for long shafts. Put the steady rest on a finished journal.
  • 3
    Two outer diametersFor hollow shafts and spindles where no center hole exists.
Sequence

Process routes and where heat treatment fits

Shaft work is usually described as four routes, and the choice depends on the tolerance and the material condition. The lightest route is rough turn, semi-finish turn, finish turn. It suits soft material and callouts looser than about ±0.05 mm.

The second route adds grinding at the end: rough turn, semi-finish turn, finish turn, then coarse grind and fine grind. Grinding is the normal way to hold a bearing journal at ±0.005 mm with Ra 0.2–0.8 μm. It removes very little material, so the turning operation has to leave a consistent grinding allowance, typically 0.3–0.5 mm on diameter.

The third route puts heat treatment in the middle: rough turn, semi-finish turn, heat treat, then finish turn or grind. That placement is not arbitrary. Hardening distorts the part and relieves stress, so any dimension cut before the furnace is a suggestion, not a size.

The fourth route is for hardened or difficult material, where the part is turned, heat treated, then ground only. Ferrous materials ground this way load the wheel and burn easily if the coolant is weak, so feed and wheel speed need attention. Non-ferrous parts generally skip grinding and finish with a fine turn or a burnishing pass instead.

  • 1
    Leave grinding stock0.3–0.5 mm on diameter, held consistently along the journal.
  • 2
    Heat treat before finishingNever cut final size before the furnace.
  • 3
    Non-ferrous finishFine turning or burnishing instead of grinding.
Measurement

Checking runout without fooling yourself

A shaft that measures correct in the chuck can still be wrong. The fixture holds it in a shape it will not keep once released. This is why final inspection is done with the part supported the way the application supports it, not the way the machine supported it.

Roundness is checked on a rotating fixture or between centers, with a dial indicator on the journal. Measure at several axial positions, not just one. A journal that reads 0.01 mm at the end nearest the chuck and 0.03 mm at the far end is telling you about deflection or tailstock alignment, not about the diameter.

Temperature matters more than most people expect. A steel shaft 500 mm long grows roughly 0.006 mm per degree Celsius. A part pulled hot from grinding and measured immediately will read undersize. Let it settle to room temperature before the final number is recorded.

We inspect 100% of parts before shipment, with reports available on request. For shaft work the report normally covers the bearing journals, the shoulder runout, and the overall straightness, because those three values predict whether the assembly will run quietly.

  • 1
    Measure in the working supportFree state, not chucked state.
  • 2
    Read several axial positionsA gradient along the journal points to deflection, not size.
  • 3
    Let the part cool0.006 mm growth per degree Celsius on a 500 mm steel shaft.
Reference

Which route fits which shaft

Use the tolerance and the material condition to pick a route. The last two columns are the ones that decide the plan.

RouteTypical toleranceBest forWatch out for
Turn only±0.05 mmSoft stock, loose calloutsBarrel shape on long parts
Turn plus grind±0.005 mmBearing journalsInconsistent grinding allowance
Turn, heat treat, finish±0.02 mmParts that harden after roughingDistortion and scale
Turn, heat treat, grind±0.005 mmHardened journalsWheel loading, burn marks
Turn plus burnish±0.02 mm, Ra 0.4 μmAluminium, copper, brassLimited stock removal

Pick the datum before you pick the tool

If the shaft has a usable center hole, turn between centers and add a steady rest once the ratio passes 8:1. If it is hollow with no center hole, grind the two support journals first and locate on those. Everything else is a detail.

FAQs

Common questions

What length-to-diameter ratio needs a steady rest?

As a working rule, shafts above roughly 8:1 benefit from support. Below that, turning between centers with moderate depths of cut usually holds size.

Above 20:1 the part needs a steady rest plus reduced depth of cut, and the plan should assume several light passes rather than one heavy one.

Why does my shaft measure oversize in the middle?

Cutting force pushes the workpiece away from the tool. The middle of a long shaft deflects most, so the tool removes less material there.

Reduce depth of cut, add a steady rest, or use a tailstock. Measuring a gradient along the journal confirms it is deflection rather than a tool offset error.

Should the center holes be cut before or after rough turning?

For heavy or heavily stressed shafts, rough turn first, then cut the centers. Roughing releases residual stress and the part moves.

Cutting the centers afterwards keeps the datum aligned with the part as it actually is, not as it arrived.

How much stock should be left for grinding?

A typical allowance is 0.3–0.5 mm on diameter. Grinding removes very little material per pass, so the allowance has to be consistent along the journal.

An uneven allowance means uneven wheel load, which shows up as taper or as a burn mark on one side.

Can aluminium shafts be ground?

They can, but it is rarely the best choice. Aluminium loads a grinding wheel and tends to smear rather than cut cleanly.

A fine turning pass or a burnishing operation usually reaches the required finish with less risk. We machine aluminium grades including 6061, 7075 and 2024 this way.

What do you need to quote a shaft part?

A 2D drawing with the tolerance callouts, the material grade, the heat-treatment requirement and the finish. A 3D model helps but does not replace the drawing.

We return a quotation and a free DFM analysis within 12 hours, and there is no minimum order quantity, from one prototype upward.

Send us the drawing and the callouts

We quote shaft and rotary parts within 12 hours, with a DFM note on datum choice and grinding allowance before you commit to the run.

12-hour quote100% inspectionNo minimum order

Follow

More from the shop floor

We publish setup notes, tooling trials and inspection data from the factory floor.