CNC Turntable Price Guide
This CNC turntable price guide is for engineers and buyers who need to read a quote without guessing. We break down what drives the number, where the hidden costs sit, and how to choose between a new table, a retrofit, or sending the work out.

In this article
- 1
- 2
- 3
- 4
- 5
- 6
- 7
Key takeaways
Buy a turntable, retrofit, or outsource
Match your workload to the option that fits it.
| Condition | Buy new table | Retrofit existing | Outsource to partner |
|---|---|---|---|
| Rotary hours per year | Over 1,500 h | 1,500 h or more | Under 200 h |
| Positioning accuracy needed | ±15 arc-sec or tighter | ±30 arc-sec typical | Dependent on supplier |
| Part geometry | 3+ faces, one setup | Simple 2-face work | Complex 5-axis work |
| Capital available | Full machine budget | Table and controls only | No capital outlay |
| In-house spindle time | Spare capacity exists | Spindle is underused | Spindle is fully booked |
| Certification needs | Customer audit covers it | Audit may need update | Supplier holds ISO 9001 |
What actually moves a CNC turntable price
A CNC turntable price is not set by diameter alone. Two tables the same size can differ by a factor of four. The gap comes from what the table must hold under cutting load. A positioning-only table indexes to a point and locks. A simultaneous table drives the part while the tool is in the cut, so the worm gear, bearing preload, and encoder resolution all tighten.
Start with the load case. A 50 kg fixture on a Ø400 mm table at 200 mm from center produces a different torque demand than a 5 kg part at 80 mm. Ask the supplier for the allowable unbalance and the axial load rating. If those numbers are missing from the quote, the price is not comparable to anything.
Indexing accuracy and repeatability are two specs. Indexing accuracy is how close the table lands to the commanded angle. Repeatability is how close it returns to the same angle over many cycles. For most production work, repeatability matters more. A table rated ±15 arc-sec indexing and ±5 arc-sec repeatability behaves better than one rated ±10 arc-sec on paper with no repeatability figure.
Encoder type is the next split. A standard incremental encoder on the motor shaft is cheap and works for positioning. A direct-mounted rotary encoder on the table itself costs more but removes backlash and belt stretch from the reading. If your tolerance is tighter than ±0.01 mm on a 150 mm radius, budget for the direct encoder.
- 1Torque at the partCalculate from part mass × distance from center, then add fixture weight.
- 2Repeatability over accuracyProduction wins come from returning to the same angle, not from a single perfect index.
- 3Encoder mountingDirect table-mounted encoders remove drivetrain error from the feedback loop.
Costs that sit outside the machine quote
The turntable invoice is the visible line. The rest shows up over the first year. Tooling for rotary work often needs extended reach holders, because the part swings in an arc and the tool must clear the table edge. Those holders cost more than standard ones and may need balancing for higher spindle speeds.
Fixtures are the second line. A trunnion fixture for a one-off job can cost as much as a month of machine time. If the part family changes often, a modular zero-point system pays back faster than a dedicated fixture. That decision belongs in the same spreadsheet as the table price.
Coolant and chip evacuation change too. Rotary work throws chips in a wider arc, so a machine with a weak conveyor will stall. Add the cost of a chip conveyor upgrade if the current one is sized for 3-axis work only.
Operator time is the quietest cost. A 5-axis setup with a rotary table takes longer to prove out than a 3-axis setup. The first article may need two or three proving cycles. If you are quoting a job, put an extra 4 to 8 hours of setup into the estimate. If you are buying a table, ask whether the supplier includes on-site alignment and a test cut.
- 1Extended toolingLonger holders and balance grades add cost and lead time.
- 2Fixture strategyDedicated fixtures are cheap per part and expensive per job change.
- 3Chip handlingRotary cutting spreads chips wider; check conveyor capacity.
- 4Proving timeBudget 4 to 8 setup hours for the first 5-axis rotary job.
Seven specs to request before you compare CNC turntable price
A quote without spec numbers is a guess. Ask for the same seven values from every supplier, then put them side by side. The lowest price often loses on one of these, and that gap shows up as scrap later.
Start with table diameter and through-hole. The through-hole matters because it sets the largest bar or cable you can pass. A Ø400 mm table with a 60 mm through-hole cannot take a 80 mm shaft, no matter what the load rating says.
Next, ask for maximum speed in rpm and the allowable unbalance in N·mm. Speed and unbalance are linked. A table rated to 100 rpm with a balanced load may only be safe to 40 rpm with the fixture you have. Suppliers who cannot state unbalance are quoting a catalog number, not a machine.
Finally, ask for the clamping torque or brake holding force. Simultaneous cutting pushes against the table. If the brake is weak, the table creeps during a heavy cut and the surface finish suffers. The numbers should be in the quote, not in a follow-up email.
- 1Table diameter and through-holeSets the largest part or bar that can pass through.
- 2Indexing accuracy and repeatabilityTwo separate numbers; ask for both in arc-sec.
- 3Maximum speed and unbalanceRated rpm must match your actual fixture balance.
- 4Brake holding torqueWeak clamping shows up as chatter and finish drift.
When outsourcing beats buying a turntable
Capital is not the only cost. A turntable needs floor space, power, coolant, and a trained operator. If your plant runs one shift and the rotary work is a small share of spindle time, the table sits idle most of the week while you still pay for it.
A machining partner spreads that cost across many jobs. At GreatLight we run 16 simultaneous 5-axis machining centers and 16 mill-turn centers, with a Ø400 mm rotary table in the mix. That capacity exists whether your job runs or not. You pay for the hours you use.
Outsourcing also brings the process knowledge. Rotary work fails on tool clearance, fixture stiffness, and chip evacuation more often than on the table itself. A partner who runs rotary jobs daily has already solved those problems. You get the first article faster.
The trade-off is control. If the part is a core product or the geometry is confidential, you may want it in-house. We sign NDAs on request and treat every upload as confidential. For most other cases, sending the rotary work out and keeping the simple 3-axis work in-house is the cheaper split.
If you do buy, remember the table is one line in a larger budget. If the number in this CNC turntable price guide looks high, check whether the alternative is a partner quote. The right answer depends on hours, not on pride.
- 1Under 200 rotary hours a yearOutsourcing usually wins on total cost.
- 2Over 1,500 rotary hours a yearIn-house capacity starts to pay back.
- 3Confidential geometryNDA and in-house control may justify the capital.
How to source rotary work without overpaying
Follow these steps in order. Each one removes a source of cost or risk.
- 1Define the part familyList every part you expect to run in two years, with mass, size, and material. This stops you from buying a table sized for one job.
- 2Calculate the real torqueTake the heaviest part mass, add fixture mass, multiply by the distance from table center. If the result is within 60% of the table rating, move up one size.
- 3Get three quotes with the same spec sheetSend the same seven specs to each supplier. Quotes that omit a spec are not comparable. Ask for arc-sec values in writing.
- 4Compare total cost, not purchase priceAdd tooling, fixtures, conveyor upgrade, and 8 hours of proving time to each option. The lowest invoice is often not the lowest total.
- 5Check the supplier's qualification pathAsk for a test cut on your material before shipment. For medical or automotive work, ask which certifications apply (ISO 9001, IATF 16949, ISO 13485).
- 6Decide buy or outsource on hoursIf rotary cutting is under 200 hours a year, get a per-part quote from a partner before you commit capital.
Common questions on CNC turntable price
Does a larger table always cost more?
No. A Ø400 mm table built for ±15 arc-sec indexing and continuous 5-axis motion costs more than a Ø630 mm table built for positioning only.
Size sets the load capacity. Accuracy class and drive type set the price. Ask for the accuracy class first, then the diameter.
What accuracy should I ask for on a quote?
Ask for indexing accuracy and repeatability in arc-seconds. For general milling, ±30 arc-sec indexing and ±15 arc-sec repeatability is a common starting point.
For tighter work, such as a bore held to ±0.005 mm on a 150 mm radius, you need both a tight table and a direct-mounted encoder. The table alone will not get you there.
Is a retrofit table cheaper than a new machine?
The table itself is cheaper. The installation is not always. Retrofitting an older machine often needs new drives, a control update, and alignment work.
Add those lines before you compare. A retrofit that needs a new control can land close to a new machine of the same class.
How do I compare quotes from different suppliers?
Send the same spec sheet to each supplier and require the same seven values: diameter, through-hole, indexing accuracy, repeatability, max speed, unbalance, and brake torque.
Any quote missing a value is not comparable. Ask for it in writing before you rank the prices.
What lead time should I expect for rotary work?
At GreatLight, quotation and free DFM analysis come back within 12 hours. Production can start within 24 hours, and parts ship in 3 to 5 days.
That timeline assumes the fixture and tooling are ready. First-article rotary jobs need proving time on top of the ship window.
Can I run rotary work without a turntable?
Yes, by using multiple setups on a 3-axis machine. The cost is setup time and stacked tolerance.
If the part needs three or more faces held to tight position, the stacked error from re-fixturing usually costs more than the rotary work itself.
Get a quote on your rotary parts
Send your drawings and we will come back with a process plan, a DFM note, and a price within 12 hours. No minimum order quantity, from one prototype to 10,000+ parts.
12-hour quoteNo MOQ100% inspection