CNC processing services in Belgium: how to pick a supplier
This guide is for engineers and purchasing teams in Belgium who need machined parts and are comparing quotes. It covers the checks that actually decide a project: tolerance, lead time, order size, certifications, and what a quote should contain. Read it before you send a drawing out.

In this article
- 1
- 2
- 3
- 4
- 5
- 6
- 7
What matters most when you compare suppliers
Which process fits which part
Use this to match a part to a process before you request a quote.
| Part situation | Process to ask for | Typical tolerance | Watch out for |
|---|---|---|---|
| One-off prototype, simple shape | 3-axis milling | ±0.01 mm | Setup cost spread over one part |
| Prototype with undercuts or deep pockets | 5-axis machining | ±0.005 mm | Needs a clean CAD model |
| Shaft, bushing, threaded fitting | CNC turning or mill-turn | ±0.005 mm | Check roundness, not just diameter |
| Prismatic housing, 10,000+ parts | Die casting plus finish machining | ±0.05 mm as cast | Tooling lead time and cost |
| Thin-wall or cosmetic shell, low volume | Vacuum casting | ±0.1 mm | Not for structural loads |
| Sheet bracket or enclosure | Sheet metal fabrication | ±0.1 mm | Bend radius must suit thickness |
| Complex internal channel, small batch | 3D printing plus machining | ±0.1 mm | Surface finish needs a second op |
How to judge tolerance on CNC processing services in Belgium
Tolerance is the first number engineers look at, and the first one suppliers misuse. A shop that claims ±0.005 mm on every part is either not reading the drawing or not being honest. That number is a capability limit, not a default. It applies to specific features, on specific machines, with the right fixturing. On a 4,000 mm long part, thermal growth alone can eat the whole band.
The practical question is which features need tight tolerance and which do not. A bearing bore at Ø40 H7 needs the tight band. The clearance hole next to it does not. Marking that difference on the drawing lets the shop spend time where it matters and keeps the price down. If every dimension carries the same tight tolerance, expect either a high quote or a quiet refusal.
Datum choice decides whether the number is real. A part measured from three different datums will show three different results. Pick datums that match how the part sits in the machine and how it functions in the assembly. For round parts, hold roundness and concentricity, not just diameter. For flat parts, hold flatness and parallelism. Diameter alone tells you very little.
Ask what the shop measures with. A CMM report on a first article is normal. A hand caliper on a ±0.005 mm bore is not. Request raw material certificates, in-process checks, and a final inspection report. If a supplier cannot name the instruments used on your part, the tolerance claim is a marketing line.
- 1Apply tight tolerance only where it functionsBearing seats, sealing faces, and mating bores.
- 2State datums on the drawingOne primary datum, then secondary and tertiary.
- 3Match the instrument to the toleranceCMM for ±0.005 mm, calipers for ±0.1 mm.
- 4Request a first article reportBefore the full run starts, not after.
Lead time, order size, and what a quote should include
Lead time gets confused with shipping time. Machining days and transport days are separate. A shop with free capacity can start production within 24 hours of a confirmed order and ship parts in 3–5 days. Add transport to Belgium, plus customs clearance, and the door-to-door window grows. A local Belgian shop saves the transport leg but may have a longer queue.
Order size changes the process, not just the price. One prototype to a few hundred parts suits 3-axis or 5-axis milling and turning. Above roughly 10,000 parts, die casting plus finish machining usually wins on unit cost, but adds tooling cost and tooling lead time. Vacuum casting sits between the two for low-volume cosmetic or functional shells. The right answer depends on annual volume, not on the first order alone.
No minimum order quantity matters more than people expect. A supplier who will run one part lets you test the design before committing. A supplier with a 500-piece minimum forces you to guess. Ask directly whether a single prototype is possible, and whether the setup cost is charged once or per batch.
A complete quote lists material grade, stock size, machining operations, finishing steps, inspection, packaging, and freight terms. A quote that says only a unit price hides the parts that will appear on the invoice later. Ask for the finishing specification in writing: anodizing type and thickness, plating, or powder coat color code. Vague finishing is the most common source of rejected deliveries.
- 1Separate machining days from transport daysAsk for both numbers.
- 2Match process to annual volumePrototype, low volume, or 10,000+ run.
- 3Confirm the minimum order quantityOne piece should be an option.
- 4Get finishing written into the quoteType, thickness, color code.
Certifications and materials that decide the shortlist
Certifications narrow the list fast. ISO 9001:2015 covers general quality management and is the baseline. Medical device work needs ISO 13485:2016, which adds traceability and process validation requirements. Automotive and EV parts need IATF 16949:2016, which brings PPAP-style documentation. If your data is sensitive, ISO 27001:2022 covers information security, which matters when drawings leave your network.
Check that the certificate covers the site doing the work. A group certificate for one plant does not automatically cover a second plant. Ask for the certificate scope and the address on it. Then ask who signs the inspection report and whether that person is at the same site.
Material availability drives both price and schedule. Aluminum 6061-T6, 7075, and 6082 are common and easy to source. Stainless 303, 304, 316L, and 17-4PH cover most corrosion and strength needs. Titanium Ti-6Al-4V and Inconel cut slowly and wear tools, so expect longer machining time and a higher price. Plastics like POM, PEEK, and PC machine cleanly but move with temperature.
Some materials need heat treatment between operations. Annealing, normalizing, quenching, and tempering change hardness and stress state, and they change dimensions. If your part has a heat treatment step, the shop must leave grinding allowance. Skipping that step produces a part that is straight on the bench and bent after treatment. Ask where heat treatment happens and who measures the result.
- 1Match certificate to industryISO 9001, IATF 16949, ISO 13485, ISO 27001.
- 2Confirm the site on the certificateScope and address, not just the logo.
- 3Plan for heat treatment distortionLeave grinding allowance.
- 4Check material grade, not just family6061-T6 differs from 6061.
Surface finish and secondary operations
Surface finish is specified as Ra, and the number should match the function. Ra 1.6–3.2 μm is standard as-machined finish and suits most brackets and housings. Ra 0.8–1.6 μm is a finer machined finish for mating faces and sliding surfaces. Ra 0.2–0.8 μm needs slower passes, sharper tools, or a grinding step, and it adds cost quickly.
Cosmetic parts follow different rules. Bead blasting, brushing, and polishing change how light reflects, and they can hide or reveal tool marks. Anodizing comes in clear, color, hardcoat, and conductive types, and each one behaves differently on the same alloy. Hardcoat anodizing adds a thick oxide layer that grows the part by a few micrometers per surface, which matters on a tight bore.
Laser marking and engraving need room. A minimum character height of 1.5 mm keeps the mark readable after finishing. Smaller text fills in or fades. Put the mark on a flat or gently curved face, away from sealing surfaces and high-stress fillets.
Electroless nickel, zinc, silver, and gold plating each have a purpose. Nickel gives uniform coverage on complex shapes. Zinc protects steel at low cost. Silver and gold serve conductivity and contact resistance in electronics. Say which one you need and why, because the wrong plating can change fit or electrical behavior.
- 1Ra 1.6–3.2 μm for general partsAs-machined default.
- 2Ra 0.8–1.6 μm for mating facesSliding and sealing surfaces.
- 3Hardcoat anodizing grows the partAllow for oxide thickness on bores.
- 4Laser marks need 1.5 mm minimum heightSmaller text fades after finishing.
Step by step: from drawing to delivered parts
Follow these steps to keep a project on schedule and avoid rework.
- 1Send a STEP file and a 2D drawingThe 3D model sets geometry. The 2D drawing carries tolerances, datums, and finish callouts. Missing one of the two forces the shop to guess.
- 2State material grade and heat treatmentWrite 6061-T6, not aluminum. Write 17-4PH H1025, not stainless. Note any heat treatment step and where it happens.
- 3Mark critical features on the drawingCircle the features that need ±0.005 mm. Leave the rest at general tolerance. This alone can cut a quote by double digits.
- 4Request DFM feedback with the quoteA good shop returns a short list of changes: thin walls, deep pockets, sharp internal corners, or tolerances that need a different process.
- 5Confirm finishing and inspection in writingName the anodizing type and thickness or the plating spec. Ask for the inspection report format before production starts.
- 6Approve the first article before the full runCheck dimensions, finish, and marking on the first part. Fixing a problem at one piece costs less than fixing it at ten thousand.
- 7Agree on packing and freight termsConfirm whether parts ship individually bagged, in trays, or bulk. State the Incoterm and the receiving address.
Questions engineers ask before ordering
Can a supplier outside Belgium still meet a Belgian delivery schedule?
Yes, if machining capacity is free. Production can start within 24 hours of a confirmed order, and parts ship in 3–5 days. The variable is transport and customs, which adds days you should plan for.
The comparison is not local versus overseas. It is queue time at the chosen shop versus transport time to your dock. Ask both shops for the machining start date and the ship date, then add your own freight estimate.
What tolerance should I put on a general drawing?
Use a general tolerance block, typically ±0.1 mm for machined metal features, and tighten only the features that function. That keeps the quote realistic and tells the shop where to spend time.
For a bearing bore or a sealing face, call out the specific tolerance and the datum. Do not apply it to the whole drawing.
Is there a minimum order quantity?
No. Work can start from one prototype and run to 10,000+ parts. Setup cost is charged once per batch, so a single piece carries the full setup.
If your program will scale, ask how the setup is handled on repeat orders. That is where the unit price drops.
How do you protect drawings and design data?
Uploads are handled as secure and confidential, and a non-disclosure agreement is available on request. ISO 27001:2022 covers information security at the site.
Send the NDA before the drawing if your program requires it. It is faster to sign once than to chase paperwork mid-project.
Which materials can be machined?
Aluminum 6061, 6061-T6, 2024, 5052, 5083, 6063, 6082, 7075, and ADC12. Stainless 303, 304, 316, 316L, 420, 430, 431, 440C, and 17-4PH. Steel 1018, 1045, 4130, 4140, 4340, A36, and tool steel.
Also copper and brass grades, titanium TA1, TA2, TC4, Inconel, magnesium AZ31B and AZ91D, and plastics including ABS, PC, PMMA, POM, PA, PEEK, PP, HDPE, and carbon fibre.
What should I check first on a received quote?
Check the material grade, the tolerance callouts, the finishing spec, and whether inspection is included. Those four items cause most disputes.
Then compare lead time: machining days plus transport days. A lower price with a vague schedule is not a better quote.
Send your drawing and get a quote with DFM notes
Upload a STEP file and a 2D drawing. We return a quotation and a free DFM analysis within 12 hours, with no minimum order quantity and inspection reports on request.
12-hour quote and DFMNo minimum order quantity100% inspection before shipmentNDA available on request