Coating control
Anodizing starts at the drawing stage
Type II sulfuric anodizing builds roughly half its thickness into the aluminum and half outward. A 10 μm coating grows about 5 μm into the surface, so a threaded hole or a bearing bore changes size. We plan the pre-plate dimensions for that growth instead of discovering it after coating.
Color is a separate problem. Dye uptake depends on alloy, bath temperature, current density and how long the parts sit in the seal. When top and bottom shells must match, we run them in the same batch, on the same rack, with the same surface preparation.
- 1
Batch-matched colorBoth halves of a case anodized together so the seam disappears.
- 2
Hardcoat where it is neededType III for wear surfaces and exposed edges that see daily handling.
- 3
Masking for conductive zonesGrounding points and antenna contact areas kept bare.