GreatLight CNC Machining Factory logo
CNC Machining
Rapid Prototyping
Materials
Industries
News
About GL

Get Instant Quote

About the team

Andy Lu, CNC Machining Engineer

Andy Lu works on turning and milling setups at GreatLight in Dongguan. He reviews drawings, picks fixtures, and decides how a part should be cut before it reaches the machine.

Turning and 5-axis milling±0.005 mm toleranceStainless and titaniumDFM review in 12 hours
cnc machining
15Years in CNC machining
127High-precision CNC machines
±0.005 mmAchievable tolerance
3Wholly-owned plants
Where parts go wrong

Four problems engineers bring to us

These are the failures we hear about most often from US and EU buyers before they place an order.

01

The first article passes, the tenth does not

A single sample is approved and then the run drifts. Without in-process checks, a setup shift shows up only after parts are plated, and the whole lot goes to scrap.

02

Thin walls come back bowed

Wall sections under 1 mm move when the stock is released and heat builds in the cut. The part measures fine on the bench and fails on the assembly fixture.

03

Surface finish is written as a vague note

A drawing says "smooth" or "Ra fine" with no number. The shop picks a finish, the mating seal leaks, and the argument starts after the parts arrive.

04

A tight corner that no tool can reach

An internal radius is drawn at 0.5 mm on a pocket 30 mm deep. No standard end mill reaches it, so the shop either quotes a special tool or quietly changes the geometry.

How we work

What Andy Lu checks before the spindle turns

A short review up front removes most of the rework later.

CNC Lathe Technical Specifications Terminology
Setup planning

Fixture and datum choices decided on paper first

Most dimensional problems on turned parts come from the fixture, not the machine. Andy Lu looks at the drawing and asks which face can be gripped without distorting the part, and which features can be cut in the same setup. When two bores share a tolerance callout, cutting them without a re-chuck removes the stack-up entirely.

For a stainless housing with a Ø40 mm bore held to ±0.005 mm, the plan usually means a soft jaw bored to the actual stock diameter, a light roughing pass, then a finish pass after the part has cooled. The toolpath is written so the finish cut removes a constant chip load. A part that was going to be run in three operations often comes back to two.

  • 1
    Datum selectionPick faces that stay reachable through the whole sequence.
  • 2
    Setup countFewer re-chucks means less stack-up error on concentric features.
  • 3
    Cooling pauseLet the part settle before the finish pass on tight bores.

Get Instant Quote

oplus_262178
Material behavior

Tooling and feeds chosen for the alloy, not the drawing

The same geometry behaves differently in 6061 aluminum and 17-4PH stainless. Aluminum cuts fast and throws heat into the chip, so we run high spindle speeds and light radial engagement. Titanium and Inconel hold heat in the cut zone, which means lower surface speed, more coolant, and a rigid setup to avoid chatter on thin sections.

Andy Lu flags these choices during the quote so the customer knows what the price difference is paying for. A bracket in 6061-T6 may run at 12,000 rpm with a 6 mm carbide end mill. The same bracket in TC4 (Ti-6Al-4V) runs at a fraction of that speed with a four-flute tool, and the cycle time roughly triples. That is a material decision, not a shop decision.

  • 1
    Aluminum 6061 and 7075High speed, deep cuts, good chip evacuation.
  • 2
    Stainless 303 and 17-4PHSharper edges, steady feed, watch work hardening.
  • 3
    Titanium and InconelLow surface speed, rigid hold-down, generous coolant.

Talk to an Engineer

Process selection

Which process fits the part

A quick guide to the choice we make most often, based on geometry and volume.

Part typeProcessTypical tolerance
Turned shaft, Ø5–80 mmCNC turning with live tooling±0.005 mm
Prismatic housing, 3 sides3-axis mill, two setups±0.01 mm
Complex contour, one setup5-axis simultaneous±0.005 mm
Long frame, 4,000 mmLarge-travel gantry mill±0.02 mm
Prototype, 1–20 pieces3-axis mill plus turning±0.01 mm
What we run

Machining services on the floor

Six capabilities that cover most parts from prototype to production.

01

5 Axis CNC Machining

Simultaneous 5-axis centers for contoured surfaces and parts that would need four setups on a 3-axis machine.

02

CNC Milling and Turning

Mills, lathes, and mill-turn centers for shafts, housings, and parts that mix turned and milled features.

03

Rapid Prototyping

One-off and low-volume parts shipped in 3–5 days, with no minimum order quantity.

04

Sheet Metal Fabrication

Brackets, enclosures, and panels when the part is flat and the volume favors forming over cutting.

05

Part Surface Finishing

Anodizing, plating, bead blasting, and laser marking, handled with the machining so finishes match the drawing.

06

Metal Die Casting

Tooling and castings for housings at volumes where machining from solid stops making sense.

Machine range

Capacity at a glance

Numbers our process planners use when they decide where a job runs.

CapabilityValue
Maximum part size4,000 mm
Large-travel work envelope4,000 × 400 × 150 mm
Medium work envelope750 × 1,150 × 550 mm
Compact work envelope500 × 500 × 450 mm
Rotary table diameterØ400 mm
Simultaneous 5-axis centers16
Mill-turn centers16
Order quantity1 to 10,000+ pieces
Why GreatLight

What the shop gives your project

15Y

Machining since 2011

Fifteen years of turning and milling, with the process knowledge that comes from running production parts rather than samples.

±0.005

Tolerance we hold in production

Not a lab number. It is the tolerance we quote on bores, spigots, and mating faces when the drawing calls for it.

12h

Quote and DFM turnaround

Send a STEP file and a drawing. You get a price and a manufacturability note within 12 hours, before any metal is cut.

127

Machines under one roof

Turning, 3-axis, 4-axis, 5-axis, and mill-turn capacity in three plants, so a job moves to the right machine instead of waiting.

ISO

Audited quality systems

ISO 9001, IATF 16949, ISO 13485, and ISO 27001 cover general industry, automotive, medical, and data handling.

1pc

No minimum order quantity

Run one prototype or ten thousand parts on the same process plan. Nothing is re-quoted because the volume changed.

Industries we serve

What each sector asks for, and what we deliver

Leader in Cnc Machining Service China

Medical devices

Biocompatible stainless and titanium parts with full traceability and 100% inspection before shipment.

  • ISO 13485
  • Ra 0.8–1.6 μm
  • 100% inspection
GreatLight Metal new factory building

Automotive and EV

Housings, brackets, and busbar parts run to IATF 16949 process control with in-process monitoring.

  • IATF 16949
  • ±0.005 mm
  • 3–5 day ship
CNC Machining Services Online

Robotics and automation

Joint housings, end effectors, and frame plates where concentricity across two setups decides how the arm moves.

  • 5-axis
  • ±0.005 mm
  • Mill-turn
CNC Machining Services Comparison 2026 Fictiv vs Xometry vs GreatLight

Industrial machinery

Long frames and base plates up to 4,000 mm, machined on large-travel machines without splicing.

  • 4,000 mm
  • ±0.02 mm
  • Gantry mill
FAQs

Questions engineers ask Andy Lu

What files do you need for a quote?

A STEP or IGES model plus a 2D drawing with tolerances, material, and finish. The 3D model shows geometry, but the drawing carries the tolerance callouts and surface requirements that set the price.

If you only have a model, send it anyway. We mark the features where a tolerance callout is missing and ask before quoting.

How tight a tolerance can you hold on a turned part?

On bores, spigots, and mating faces we hold ±0.005 mm (±0.0002 in) in production when the drawing calls for it. That number assumes a stable material and a part rigid enough to hold in a chuck without distortion.

On long thin shafts or thin-wall tubes, the achievable tolerance depends on the length-to-diameter ratio. We will tell you the realistic number before you order.

Which materials do you machine most?

Aluminum 6061-T6, stainless 303 and 17-4PH, and titanium TC4 (Ti-6Al-4V) cover most of what comes through the door. We also run 7075, 304 and 316L, 4140, brass C36000, and engineering plastics such as POM and PEEK.

Material choice drives cycle time more than any other single factor. A part that runs in 20 minutes in aluminum can take an hour in titanium.

Can you start production before the drawing is finalized?

Not on toleranced features. We can release material and prepare fixtures while the drawing is in review, and production can start within 24 hours once the drawing is signed off.

If a dimension is still open, we mark it and hold that operation rather than guessing.

How do you handle surface finish requirements?

We work to a number, not a word. As-machined is Ra 1.6–3.2 μm, a high-quality machined finish is Ra 0.8–1.6 μm, and fine finishing reaches Ra 0.2–0.8 μm.

If the drawing says "smooth" with no value, we ask which surface matters and what it seals or slides against.

What happens if parts fail inspection?

Every part is checked before shipment, and reports are available on request. If a dimension is out of tolerance, we tell you before the parts leave the plant and rework or remake them.

Our historical qualification rate is 99.99%, which is a record of past runs, not a promise about your part.

Do you sign an NDA?

Yes, on request. Uploads are kept secure and confidential, and we can sign your NDA or provide ours before you send drawings.

ISO 27001 covers how we handle customer data internally.

Can you run one part and then scale to production?

Yes. There is no minimum order quantity, and the process plan from the prototype carries into the production run, so the geometry does not change between the first part and the thousandth.

Tell us the expected annual volume at the quoting stage. It affects fixture design and whether a second setup is worth eliminating.

Send your drawing to Andy Lu's team

Upload a STEP file and get a price with a manufacturability review within 12 hours.

12-hour quote100% inspectionNo minimum order quantityNDA on request

Trusted by engineers and manufacturers worldwide

Tesla Ford Motor Company BYD Auto Denso Magna International Boeing Airbus Medtronic KUKA FANUC