Same-day dispatch
Release before 09:00 China time. Single-operation milling or turning, material in stock, no design change after release. Courier cut-off 18:00, tracking sent the same evening.
When a line is down or a build is blocked, the part is the schedule. Release the drawing before 09:00 China time and single-operation parts leave the plant the same day — with the inspection report in the box.
The clock starts when the drawing is released, not when the PO is signed. Here is which track your part lands on and what has to be true for the fastest one.
Release before 09:00 China time. Single-operation milling or turning, material in stock, no design change after release. Courier cut-off 18:00, tracking sent the same evening.
Release before 18:00. Covers two-operation parts and standard finishing without an external heat-treatment step. Dispatch within 24 hours of release.
Anything that needs anodising, heat treatment or EDM after machining. Finishing is scheduled inside the window instead of adding a second supplier hand-off.
Times run from the moment the drawing is released. Nothing is cut until you approve the quote.
You send STEP/IGES plus the drawing. The urgent desk picks it up and confirms the file is machine-ready.
Price, lead time and manufacturability flags in writing — including anything that would move the part to a slower track.
Bar stock is pulled and cut, fixtures staged, tools loaded on the machine that will run it.
Single-op parts run in one setup. Multi-op and finishing follow the 24- and 48-hour tracks.
100% inspection against the drawing. Photos and the report go in the box, then the courier scans it.
If a dimension is challenged on arrival, send the measurement and we will review the inspection data the same day.
Expedite orders displace capacity across 127 machines and three plants — they do not push another customer's delivery date.
Complex geometry finished in one setup. Fewer re-fixtures is fewer hours, and the hours are the deadline.
Wall thickness, tool access and tolerance stack-up are checked at quoting. Catching a mistake at 2:00 beats finding it at 22:00.
CMM and hand-tool checks run in parallel with packing, not after it. The report ships with the parts.
Dongguan and Singapore shipping points, DHL/FedEx tracked, commercial invoice and packing list prepared the same day.
One part runs through the same inspection as a production batch. Most urgent requests we see are single pieces.
ISO 9001:2015IATF 16949:2016ISO 13485:2016ISO 27001:2022
Aerospace and defence, automotive and EV, medical devices, robotics and automation, semiconductor equipment, energy, industrial machinery.
Founded 2011 · 3 wholly-owned plants · 7,600 m² · 150 technicians · 127 CNC machines, 16 of them simultaneous five-axis.
Dongguan, China (machining) and Singapore (No.3 Joo Koon Circle, 629032) for regional supply and export handling.
09:00 China time (UTC+8), Monday to Saturday. That covers single-operation milling or turning with material in stock. Releases after 09:00 go on the 24-hour track, and the quote tells you which track you are on.
DHL and FedEx from Dongguan or Singapore: typically 3–5 working days to the US and EU, 2–4 to Southeast Asia, with tracking the day it leaves. If your deadline is tighter than that, say so in the form — we will price a faster service rather than promise one we cannot book.
Yes, and it appears as a separate line, never hidden in the unit price. The percentage depends on how much capacity has to be re-sequenced, and you see the fee before you approve the order.
STEP or IGES for geometry, plus a 2D PDF with tolerances, finish and critical features marked. If you only have a sketch, send it — we quote with the assumptions written out. NDAs are signed before upload if you need one.
Before setup, yes: the quote is reissued and the clock restarts. After setup, a revision means re-machining, and we tell you what it costs before we touch the part.
It does not ship. We remake or refund it, and you receive the inspection data either way. Parts that match the approved drawing are custom-made and are not returnable for change of mind.
Yes. Anodising, bead blasting, black oxide and polishing run in-house on site, which is why finishing moves a part to the 48-hour track instead of adding a separate supplier.
Yes. There is no minimum order quantity, and one part goes through the same inspection as a production batch.
Send the drawing and we will tell you in writing, within two hours, whether the part ships today, tomorrow or in 48 hours — and what it costs either way. No account, no minimum order, no obligation to proceed.
Quote by 2:00Same-day dispatchReport in the box
The standard quote form for work that is not on a clock — same engineers, same DFM review.
How prototype and low-volume orders are routed when the part is still changing.
Certifications, inspection standards, material certificates and our NDA.
Trusted by engineers and manufacturers worldwide
Upload your 3D model or 2D drawing and get a quotation with a free DFM analysis. Maximum processing size 4,000 mm.
CNC Metals 13 grades
CNC Plastics 10 grades
Machines & processes 12 options
Surface & post-processing 10 options
Material: not selected Machine: not selected Post-process: not selected
Fill in this short form and we'll open WhatsApp with your message ready to send. We only use these details to reply to you.
Nothing is sent until you press send inside WhatsApp.